The Filter Cartridge Dust Removal Equipment

Model NO.: HR
Warranty: 12 Months
Trademark: PUHUA
Transport Package: in Container
Origin: China
Pulse Bag Dust cleaning/dust removal equipment

General Introduction:
1) Offer high efficiency with our air filter cartridges 
2) Tool-free hole cap can be disassembled or replaced 
3) Choose the proper air filter cartridge according to the property of dust.

Construction: 
1) Material: Carbon steel or stainless steel 
2) Installed with pulse valves and control system 
3) Block building structure, can be constructed to handle the required airflow

Application: 
1) Welding fume, foundry 
2) Food, pharmaceutical 
3) Shot blasting 
4) Tobacco, metal, painting 
5) Energy

The Filter Cartridge Dust Removal Equipment
The Filter Cartridge Dust Removal EquipmentThe Filter Cartridge Dust Removal Equipment

Technical Parameters:

PARAMETER

Removing dust air volume

Filtration(cubic meters)

Induced draft fan rate(kw)

HR-4

3000

80

5.5

HR-8

6000

120

7.5

HR-12

9000

180

11

HR-16

12000

240

22

HR-24

18000

360

22

HR-32

24000

480

30

HR-36

27000

540

37

HR-40

30000

600

37

HR-48

38000

720

37

HR-56

42000

840

45

HR-64

56000

860

45


Company Information:

Qingdao Puhua Heavy Industrial Machinery Co., Ltd. was founded in 2007. We focus on designing, researching and developing, manufacturing and selling shot blasting machine, CNC punching machine, sand preparation equipment, moulding core production equipment, and environmentally-friendly dedusting equipment.

We have more than 60 self-developed designs and molds for you to choose from. We release at least 10 new products monthly to meet the latest market trends. With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers.
The Filter Cartridge Dust Removal Equipment

 

Contact Information:
The Filter Cartridge Dust Removal Equipment
Our Service:

1. Installation and commissioning issue:

We will send 1-2 technicians to assist with machine installation and commissioning, 

customer  pays for their tickets, hotel and diet, etc Customer need arrange

3-4 skilled worker and prepare insallation machinery and tools.

2. Warranty time:

12 months from date of commissioning completion,  but no more than 18 months from date of delivery.

3. Supply full English documents:

including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.

Coil & Heat Exchangers

Guangzhou Quanxu Technology Co Ltd , https://www.anticorrosionpigment.com

This entry was posted in on