OEM: 37510-90019
Fty Ref.No.: LF04Â
Motor No.: CPB12
Material: Rubber&Steel     Â
Brand: LANTECH
Application: Nissan
Size: Standard OEM Size
Packing:Â Neurtral Packing or designated packing
Place of Origin: Fujian,China        Â
Certificate: ISO/TS16949:2009
Main Market: Middle East, Southeast Aisa, Africa

Our Advantages:
- Finest raw material and advanced production equipment & technology.
- Manufacturer,widely supplier resources,Competitive Factory Price
- More than 30 years experience in auto parts
- Fast delivery and professional service
- Wide range of products and apply for series of truck brand
- Quality system following ISO/TS16949:2009
- We offer sample for you to test quality
- Professional and full of youthful spirit team
Xiamen Skysun Imp & Exp.Trade Co.,Ltd is a professional company that focus on truck and trailer chassis parts.Especially on torque rod bush,engine mount,center bearing,air spring,king pin kit,U-bolt etc.
With the backup of its own factory(1985 established) and strong sourcing ability,Skysun supplies much competitive price and high grad quality products to customers and win a good reputation base on its excellent services in this field.
In future,we will do more and more better to support our customers.We would be much appreciate and strive to create a new great business relationship with customers and let business not only business but cooperation,service and win-win partners.

Products range
Our range of products cover all kinds of automotive rubber parts,transmission parts for trucks and trailers.Such as:Torque Rod Bush,Engine Mounting,Center bearing,Air spring,Shock Absorber,U-bolts,King Pin Kit,Repair Kit.Our quality system following ISO/TS16949:2009.

Quality control
We using of the finest raw materials with the most modern technologies and up-to-date production machineries to give our customers premium quality products.
We maintain strict quality control and constant quality surveillance through to final assembly and packing.
We pay strict attention to products is in high bond strength or good anti-vibration properties through our Testing Center.

Packing & Shipping
Generally,we pack the products in neutral white boxes and brown cartons.If the customer has special requirements, we will according to customer requirements packaging.
Packing size:Â
One Box Size       15.5 X 10.9 X 11CM
6 Pcs Carton Size   34 X 30.2 X 11.7 CM
8 Pcs Carton Size   45.5 X 32 X 13.8 CM
12 Pcs Carton Size  34.5 X 32 X 24 CM

Exhibition and Customer Visit
World wide exhibition we took part in and planned yearly: Indonesia, Dubai, India, Vietnam, Cambodia, South Africa, Panama,Russia, Iran...
Also, we visit our customers everytime we go abroad with our updating sample, catalog, and quotation sheet for customer reference and save their time.

Other Auto Parts We supply:
Name | Auto Brand | OEM/ Remark |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-Z2000  |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-Z2005  |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-00Z04      |
Torque Rod Bush | HYUNDAI | 55542-00Z03           |
Torque Rod Bush | NISSAN, HINO, ISUZU | 49305-1110L                 |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-00Z08(TPU)   LF05 34+AB |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-00Z08(TPU)   LF05 34+AG |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-00Z08(TPU)   LF05 34+AD |
Torque Rod Bush | NISSAN,ISUZU,MITSUBISHI,HINO | 55542-00Z08(PVC)   LF05 216+ |
Torque Rod Bush | HONDA | 52385-SR3-000          |
Torque Rod Bush | HYUNDAI | HYUNDAI         |
Torque Rod Bush | STEYR | φ80*54*152    |
Torque Rod Bush | DONGFENG | φ105*52*152   |
Torque Rod Bush | AMERICAN TRUCK | ø63*144    |
Torque Rod Bush | FRIEIGHT LINER | 16-16412-000    |
Torque Rod Bush | TATA TRUCK | ø95MM     |
MOUNTING | MITSUBISHIÂ | ME031962Â FRONTÂ MOUNTINGÂ FN215 |
MOUNTING | MITSUBISHIÂ | ME031964Â REARÂ MOUNTINGÂ FN215 |
MOUNTING | MITSUBISHI | ME031965Â REARÂ MOUNTING |
MOUNTING | MITSUBISHIÂ | ME062358Â FRONTÂ MOUNTINGÂ FV413 |
MOUNTING | MITSUBISHIÂ | ME062600Â REARÂ MOUNTÂ FV413/FVÂ 313 |
MOUNTING | MITSUBISHIÂ Â | ME052576Â REARÂ MOUNTINGÂ FV313 |
MOUNTING | MITSUBISHIÂ Â | ME061703Â FRONTÂ MOUNTINGÂ FV313 |
MOUNTING | MITSUBISHIÂ | ME052272Â FRONTÂ MOUNTÂ FV418/FV515 |
SPRINGÂ BUMPER | MITSUBISHIÂ | 17225-57500Â REARÂ SPRINGÂ BUMPERÂ 8DC |
SPRINGÂ BUMPER | MITSUBISHIÂ | 12255-42101Â REARÂ SPRINGÂ BUMPERÂ 8DC |
MOUNTING | MITSUBISHIÂ CANTER | ME011832Â FRONTÂ MOUNTINGÂ |
MOUNTING | MITSUBISHI | ME011832 WITH COVER, FRONT |
MOUNTING | MITSUBISHI | ME018993Â MOUNTING |
MOUNTING | MITSUBISHIÂ NEWÂ CANTER | MOUNTING |
MOUNTING | MITSUBISHI | FRONTÂ MOUNTINGÂ 6D16 |
MOUNTING | MITSUBISHI | REARÂ MOUNTINGÂ 6D16 |
MOUNTING | MITSUBISHI | FRONTÂ MOUNTINGÂ 6D22 |
MOUNTING | MITSUBISHI | FRONTÂ MOUNTING |
CABINÂ BUSH | MITSUBISHIÂ | MC034038Â FRONTÂ CABINÂ BUSHÂ Â FV418 |
CENTER BEARING ASS | MITSUBISHI  | 12019-25403 WITH COVER  ø55  8DC9 |
CENTER BEARING ASS | MITSUBISHI | 12019-25403  ø55  8DC9 |
CENTER BEARING | MITSUBISHI | CENTER BEARING ø55 |
CENTERÂ BEARING | MITSUBISHI | MB505495Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHI | MB000076Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHI | MB54086Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHI | MB000815Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHI | MB154080Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHIÂ | MC861516Â CENTERÂ BEARINGÂ Â T653 |
CENTERÂ BEARING | MITSUBISHI | MC860215Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHI | MC864410Â CENTERÂ BEARING |
CENTERÂ BEARING | MITSUBISHIÂ | MC860259Â Â T653 |
CENTER BEARING | MITSUBISHI | MB000083 ø35 |
HOSEÂ PIPE | MITSUBISHIÂ | 8DC9/UP |
HOSEÂ PIPE | MITSUBISHI | 8DC9/DOWN |
HOSEÂ PIPE | MITSUBISHI | 6D22/UP |
HOSEÂ PIPE | MITSUBISHI | 6D40/UP |
HOSEÂ PIPE | MITSUBISHI | FV413/UP |
HOSEÂ PIPE | MITSUBISHI | FV413/DOWN |
HOSEÂ PIPE | MITSUBISHI | FV413/LONG |
HOSEÂ PIPE | MITSUBISHI | FV413/SHORT |
HOSEÂ PIPE | MITSUBISHI | Â |
HOSEÂ PIPE | MITSUBISHI | Â |
LOWERÂ ARMÂ BUSH | MITSUBISHI | MB951813 |
LOWERÂ ARMÂ BUSH | MITSUBISHI | MB109662 |
LOWERÂ ARMÂ BUSH | MITSUBISHI | MB430960 |
LOWERÂ ARMÂ BUSH | MITSUBISHI | MB631492 |
LOWERÂ ARMÂ BUSH | MITSUBISHI | MB633070 |
LOWERÂ ARMÂ BUSH | MITSUBISHI | MB161668 |
Torque Rod Bush | NISSAN | 55542-3001  UD              |
Torque Rod Bush | NISSAN | 55542-90018  UD       |
Torque Rod Bush | NISSAN | 55542-00Z02  UD    |
MOUNTING | NISSANÂ CW53,CW54 | 11328-Z2009Â REARÂ MOUNTING |
MOUNTING | NISSANÂ CWA45 | 11328-Z2008Â REARÂ MOUNTING |
MOUNTING | NISSANÂ CWB520 | 11328-00Z09Â REARÂ MOUNTING |
MOUNTING | NISSAN RF8, RF10 | 11328-00Z04 REAR MOUNTING |
MOUNTING | NISSAN RE8, RD8 | 11223-00Z05 FRONT MOUNTING |
MOUNTING | NISSANÂ CPB12Â Â | 11223-Z0007Â Â FRONTÂ MOUNTINGÂ Â Â Â Â |
MOUNTING | NISSANÂ RE8,RD8 | 11223-Z2010Â FRONTÂ MOUNTING |
MOUNTING | NISSANÂ CWBÂ 520 | 11223-00Z01Â FRONTÂ MOUNTING |
MOUNTING | NISSANÂ CPBÂ 12 | 52203-1490AÂ REARÂ CARBINÂ MOUNTING |
CENTERÂ BEARING | NISSAN | 37521-01W25 |
CENTERÂ BEARING | NISSAN | 37521-W1025 |
CENTERÂ BEARING | NISSAN | 37521-41L25 |
CENTERÂ BEARING | NISSAN | 37521-56G25Â CENTERÂ BEARING |
CENTERÂ BEARING | NISSAN | 37521-33G25 |
CENTERÂ BEARING | NISSAN | 37505-85L00 |
CENTERÂ BEARING | NISSAN | 37521-WJ1025Â UD |
CENTERÂ BEARING | NISSAN | 37521-69800 |
CENTERÂ BEARING | NISSAN | 54320-71L00 |
CENTERÂ BEARING | NISSAN | 37521-36G25 |
CENTERÂ BEARING | NISSAN | 37510-9009Â Â CPBÂ 12 |
MOUNTING | NISSAN | 54320-TILOO |
LOWERÂ ARMÂ BUSH | NISSAN | 54476-66U20 |
LOWERÂ ARMÂ BUSH | NISSAN | 54560-20N00 |
LOWERÂ ARMÂ BUSH | NISSAN | 55135-01J10 |
LOWERÂ ARMÂ BUSH | NISSAN | 55157-5P000 |
HOSEÂ PIPE | NISSAN | HOSEÂ PIPEÂ Â RD8/UP |
HOSEÂ PIPE | NISSAN | HOSEÂ PIPEÂ Â RD8/DOWN |
HOSEÂ PIPE | NISSAN | HOSEÂ PIPEÂ Â RE8/UP |
HOSEÂ PIPE | NISSAN | HOSEÂ PIPEÂ RF8/UP |
MOUNTING | HINO FS271, EF750 | 12031-1801A FRONT  |
MOUNTING | HINOÂ FSÂ 270 | 12035-2340Â Â REARÂ |
MOUNTING | HINO FS271, H07D | 12031-1720B  FRONT |
MOUNTING | HINOÂ EF500,H07D | 12035-1061Â REARÂ |
MOUNTING | HINOÂ FS270 | 12031-1080Â FRONTÂ |
MOUNTING | HINOÂ RANGER | 12035-1850Â REARÂ |
MOUNTING | HINOÂ FG | 12031-2021Â FRONT |
MOUNTING | HINOÂ FG | 12035-1660AÂ Â REARÂ |
MOUNTING | HINO KR, LB | 12031-1020  FRONT |
MOUNTING | HINOÂ LB | 12035-1050Â Â REAR |
MOUNTING | HINOÂ ZM | 48301-1180Â SPRINGÂ BUMPER |
MOUNTING | HINOÂ FG | 52406-1070Â CABINÂ BUSH |
MOUNTING | HINO | 12031-2532Â FRONTÂ |
MOUNTING | HINO | 12031-2231Â FRONT |
MOUNTING | HINO | 12032-1131AÂ Â LH |
MOUNTING | HINO | 12032-1131AÂ Â RH |
MOUNTING | HINO | MOUNTING |
MOUNTING | HINO | MOUNTING |
MOUNTING | HINO | 12031-1880Â Â MOUNTING |
WATERÂ PIPE | HINO | AIR/LÂ Â F17C |
HOSEÂ PIPE | HINO | EF300/DOWN |
WATERÂ PIPE | HINO | EF750 |
HOSEÂ PIPE | HINO | EF750/UP |
HOSEÂ PIPE | HINO | EF750/DOWN |
HOSEÂ PIPE | HINO | EK100/UP |
HOSEÂ PIPE | HINO | EK100/DOWN |
HOSEÂ PIPE | HINO | E17C/UP |
HOSEÂ PIPE | HINO | E17C/DOWN |
HOSEÂ PIPE | HINO | AIR/SÂ Â F17D |
HOSEÂ PIPE | HINO | AIR/LÂ Â F17D |
HOSEÂ PIPE | HINO | F20C/UP |
HOSEÂ PIPE | HINO | F20C/DOWN |
MOUNTING | ISUZU | 1-53225-061-0Â Â FRONTÂ V10 |
MOUNTING | ISUZU | 1-53225-187-0Â Â REARÂ Â V10 |
MOUNTING | ISUZU | 1-53225-075-0Â Â REARÂ TXD |
 | ISUZU | SPZ |
MOUNTING | ISUZU | LH |
MOUNTING | ISUZU | RH |
NYLONÂ BUSH | ISUZU | 9-51519-575Â NYLONÂ BUSHÂ SPZ |
MOUNTING | ISUZU | 1-53225-062-0Â Â RH |
MOUNTING | ISUZU | 8-9703918-0Â LH |
MOUNTING | ISUZU | 8-9703918-0Â Â RH |
CENTERÂ BEARING | ISUZU | 5-37516-006-0 |
CENTER BEARING | ISUZU | 1-37516-005-1  ø40 |
CENTER BEARING | ISUZU | 1-37516-006-1  ø32 |
CENTER BEARING | ISUZU | 9-37516-030-0  ø32 |
CENTER BEARING | ISUZU | 1-37516-105-0  ø45 |
CENTER BEARING | ISUZU | 5-37516-007-1 ø45 |
CENTERÂ BEARING | ISUZU | 9-37516-045-0Â Â SPZ |
CENTERÂ BEARING | ISUZU | 8-94222-972-0Â |
CENTERÂ BEARING | ISUZU | 8-94328-799-0Â |
CENTERÂ BEARING | ISUZU | 8-94328-800-0 |
CENTER BEARING | ISUZU | 1-37516-043-1  ø50/ø55/ø60/ø65 |
LOWERÂ ARMÂ BUSH | ISUZU | 8-94336-509 |
LOWERÂ ARMÂ BUSH | ISUZU | 8-9701865-0 |
LOWERÂ ARMÂ BUSH | ISUZU | 8-97081408-0 |
LOWERÂ ARMÂ BUSH | ISUZU | 8-97021055-0 |
LOWERÂ ARMÂ BUSH | ISUZU | 8-97018166-1 |
LOWERÂ ARMÂ BUSH | ISUZU | 8-94375106-0 |
HOSEÂ PIPE | ISUZU | 6HE1/UP |
HOSEÂ PIPE | ISUZU | 6HE1/DOWN |
HOSEÂ PIPE | ISUZU | 6WF1/DOWN |
HOSEÂ PIPE | ISUZU | 10PC1/UP |
HOSEÂ PIPE | ISUZU | 10PC1/DOWN |
MOUNTING | TOYOTA | 12361-78100Â RH |
MOUNTING | TOYOTA | 12362-78100Â LH |
MOUNTING | TOYOTA | 12361-17020 FRONT LCS, HZJ75 |
CENTERÂ BEARING | TOYOTA | 37230-38010 |
CENTERÂ BEARING | TOYOTA | 37230-22042 |
CENTERÂ BEARING | TOYOTA | 37230-24010 |
CENTERÂ BEARING | TOYOTA | 37230-35050 |
CENTERÂ BEARING | TOYOTA | 37230-35030 |
CENTERÂ BEARING | TOYOTA | 37230-35080 |
CENTERÂ BEARING | TOYOTA | 37230-35061 |
CENTERÂ BEARING | TOYOTA | 37230-36060 |
CENTERÂ BEARING | TOYOTA | 37230-36H00 |
CENTERÂ BEARING | TOYOTA | 37230-20090 |
CENTERÂ BEARING | TOYOTA | 37230-40031 |
CENTERÂ BEARING | TOYOTA | 37230-35013 |
CENTERÂ BEARING | TOYOTA | 37230-87302 |
CENTERÂ BEARING | TOYOTA | 48609-22010 |
CENTERÂ BEARING | TOYOTA | 48609-22030 |
CENTERÂ BEARING | TOYOTA | 48603-06020 |
CENTERÂ BEARING | TOYOTA | 48609-06070 |
CENTERÂ BEARING | TOYOTA | 37230-35120 |
MOUNTING | TOYOTA | 12361-16040 |
MOUNTING | TOYOTA | 12361-11160 |
MOUNTING | TOYOTA | 12380-42080 |
MOUNTING | TOYOTA | 12371-11210 |
MOUNTING | TOYOTA | 12371-75030 |
MOUNTING | TOYOTA | 12371-54050Â REARÂ HILUXÂ LN65 |
MOUNTING | TOYOTA | 12371-11430Â REARÂ |
LOWERÂ ARMÂ BUSH | TOYOTA | VIOS/LH |
LOWERÂ ARMÂ BUSH | TOYOTA | VIOS/RH |
LOWERÂ ARMÂ BUSH | TOYOTA | 48654-32080 |
LOWERÂ ARMÂ BUSH | TOYOTA | 48654-12120Â |
Torque Rod Bush | MERCEDES BENZ | 000-350-1005  ø67×115 |
Torque Rod Bush | MERCEDES BENZ | ø67×100 |
Torque Rod Bush | MERCEDES BENZ | 000-330-0707  ø75×115 |
Service Scope: Steam Turbine spare parts supply; steam turbine installation, inspection & overhaul, technological upgrading, turbine technology training, turbine low oil pressure renovation, turbine rotor shaft bend restoration, lower turbine`s vibration and noise, remove speed governing system abnormal volatility or load swing, solve turbine insufficient output, discontent load or other common/exceptional faults.
Contract to overhaul and all kinds of turbine`s remould, turbine dynamic balance and so on, for satisfying practical operation requirements.
Provide technical support and service for operation, inspection, maintenance, accident treatment and so on.
1. Steam Turbine Maintenance/Overhaul Service
Steam turbine normal overhaul, failure treatment; main body components repair, heat exchange tubes of cooler replacement and so on.
2. Technical guidance
Generating or Industrial driving turbine inspection, overhaul, upgrading and other items technical guidance.
3. Thermodynamic System Optimizing Services
For operating or planning projects or equipment, according to end users` actual CHP(or heat-work cooling) requirements, make cycle efficiency analysis, provide system optimizing service.
4. Speed Governing System Remould
Upgrade old hydraulic governing system to digital electro-hydraulic governing system, satisfy flexi-ble configuration all kinds of control strategy requirement.
5. Flow Passage Optimization and Modification
Total modification for steam turbine shall increase old turbine`s economic efficiency with advanced technology, service life also shall be extension.
6. Turbine Parameters Remold and Modification
Apply to processing or procedure transformation (or project site change) cause turbine operation parameters` change.
7. Uncontrolled extraction steam reconstruction
Consideration of turbine security and economic, open a hole for extraction steam normally in order to heat supply reformation.
8. Steam Turbine Engineering Service
Provide small & middle size Steam Turbine Generator or industrial steam turbine complete set engineering, project design and project installation service.
9. Vibration Analysis and Rotor Dynamic Balance 24Hours Service for emergency vibration analysis and wide range rotor dynamic balance service at project site or back to factory.
10. Condensing (extraction condensing) type remodel to back pressure type
Condensing (extraction condensing) steam turbine remodel to back pressure steam turbine
11. Steam Turbine Vacuum System Upgrade
Condenser three-dimension design and upgrade, reduce heat-transfer temperature difference, increase steam exhaust vacuum degree, improve turbine economic efficiency. Water cooling remodel to air cooling.
12. Steam Turbine Enlargement Capacity Reconstruction
Reconstruct the turbine`s capacity which are caused by system or equipment changing.
13. Motor Speed Governing Variable-frequency Remould
Variable-frequency drive remould for pump systems of all kinds of industrial and mining enterprises.
14. Domestic Equipment Reconstruction
Domestic equipment reconstruction for imported turbine
15. Circulating Cooling Water System Optimization and Modification
Optimization and modification of operating circulating cooling water system, reduce operation energy consumption rate.
16. Waste Heat Steam Turbine Gland Seal System Upgrade
After upgrade, steam leakage ( effect gear box oil quality) shall be improved by the reason of waste heat parameters are not stable.
17. Spare Parts Marketing
Normal easily damaged parts warehouse, shorten delivery time. Case 1
A fertilizer company has 2 sets of steam turbine, model are: CB6-3.43/1.27/0.294 and CB6-3.43/1.17/0.294. Because end user`s power load and steam consumption are changed, the turbines must be reconstructed according to steam parameters, flow change and guarantee high efficiency.
Remould Parameters: turbine max. inlet steam is 100t/h, when inlet steam is 97t/h and inlet pressure is 3.15MPa(g), its extraction steam is 62t/h extraction pressure is 1.51MPa(g), exhaust pressure is 0.21MPa(g), guarantee output is 5800KW (deviation±5% ).
Main job of remould and overhaul:
1. Casing was sent back to manufacture`s factory for rebuilding 2 valve seat hole, expand nozzle block steam passage.
2. Change nozzle block, take out guide blade carrier.
3. The original double row governing stage impeller and blade was changed to single row governing stage impeller and blade, add governing stage sheath, parts of rotor sleeve need to be changed and adjusted.
4. LP stage 3rd diaphragm steam passage inspection optimization.
5. Casing and rotor dismounting and assembling in factory with comprehensive inspection.
6. Rotor low speed dynamic balance test.
7. Governor static test in factory, overspeed test.
8. Dismount & assembly, overhaul at project site.
9. Clear incrustation for steam governing valve, nozzle and blade.
10. Gland seal inspection and replacement, gland sealing clearance adjustment, change the seal block which was severe wear, spring leaf which are damaged should be changed.
11. Every bearing repair and adjust.
12. HP & LP governing steam valve grinding, stroke adjustment.
13. Front bearing pedestal dismounting and inspection, patch oil leaking points.
14. Inspection and patching steam leaking of HP steam governing valve link rod.
15. Turbine mainbody troubleshooting. After remolding is complete, the 2 turbine sets are running very well.
Case 2 There is a paper mill which has a set of steam turbine: B6-3.43/0.981. Due to processing consumption in workshop and load were changed, the end user request reset new back pressure and achieve the best efficiency within the shortest time.
Parameters reform to: when rated inlet flow: 55t/h, inlet pressure: 3.43±0.2MPa(a), exhaust pressure: 0.59MPa(a), steam rate guarantee value must be 11.65kg/(kw·h), output power must be 4700KW under rated working condition. The reconstruction project is a turnkey project, from preparing components to dismount heat material, equipment dismounting and installation, till to equipment commissioning successfully.
For reducing the work amount, keep casing and pipelines still, main jobs are following:
1. Change front & rear gland seal and diaphragm seal.
2. Change main shaft assembling (keep mail oil pump and coupling still).
3. Change HP nozzle block, HP guide blade carrier and original 2 stage diaphragm, add 3 stage diaphragm, 5 stage diaphragm adopts special design for satisfy the requirement.
4. Change the original 3 stage impeller and add another 3 stage impeller.
5. Steam governing valve link rod adjust inlet steam, check all butterfly valves matching conditions, improper ones should be changed.
6. Original rotor`s coupling, MOP shall be mounted in new rotor.
7. Rotor balance.
8. Change sylphon of governing system.
9. Change pressure transducer sleeve, adjust hydraulic servo-motor stroke.
10. Governor static test in factory.
11. Clear oil system.
The reconstructed steam turbine is B4.7-3.43/0.59, end user evaluates steam rate, vibration, exhaust temperature very strictly, but the reconstructed steam turbine is running very well and fully meet the design performance.
Steam Turbine Care,Steam Turbine Services Shandong Qingneng Power Co., Ltd. , https://www.steamturbine.be |