Model NO.: SJ90/33
Condition: New
Extruder Type: Single Screw Extruder
Power Supply: 380V Three Phase
Inverter: ABB
Control System: PLC Control System
Operator: 2-3person /Shift
Warranty: 12monthes
After Sale Service: Available
Machine Color: as Request
Oversea Service: Available
Raw material: Plastic Granule
Trademark: suke
Transport Package: According to Your Requirement
Specification: ISO9000 ISO2000
Origin: Qingdao, China
HS Code: 8477800000
PE/PVC Plastic Corrugated Pipe Extrusion Making Extruder MachineCORRUGATED PIPE APPLICATION
Conduit pipe
Air delivery pipe
Threading pipe
Electrical wire jacket pipe
Plastic single-wall corrugated pipes have features of high temperature resistance, resistant to corrosion and abrasion, high intensity, good flexibility, etc. They are widely used in fields of auto wire, electric thread-passing pipes, circuit of machine tool, protective pipes of lamps and lanterns wire, tubes of air conditioner and washing machine, etc.
Tube end expansion is available online
Unique digital controlling system is adopted to the whole production line.
Good automatcity, high output and stable running.
EQUIPMENT LISTÂ
1. Single Screw Extruder
2. Extrusion Mould
3. Shaping Mould
4. Shaping/ Foming Tank
5. Electric System.
as the winder and cutter, will be provided according to client's requirement.Â
MACHINE SHOW:Â
Single Wall Corrugated Pipe Extrusion LineÂ
Double Wall Corrugated Pipe Extrusion Line in small diameter.Â
Double Wall Corrugated Pipe Extrusion Line in Large Diameter.Â
MACHINE TYPE:Â
model | main machine | module quantity | pipe specification |
XDCSB50 | SJ45/30 or SJ-65/30(PVC) | 40 | ø 6-50mm |
XDCSB160 | SJ90/30 SJSZ-65/132(PVC) | 48 | ø 75-160mm |
XDCSB500 | SJ120/30(PE) SJSZ-92/188(PVC) | 42 | ø 200-500mm |
TRADE TERMS
- Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
- Delivery Time: 40 days after receipt of prepayment.
- Packing Method:Â Packing film or wooden case
- Guaranteed Time:Â 12 months
MACHINERUNNING TEST AND AFTER SERVICE
- When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
- When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
- If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.Â
COMPANY SHOW:
MACHINE LOADINGS:
Â
Â
Stainless Steel Pipe,Stainless Steel Tube,Water Supply Pipe
En Standard Pipe Thermal Insulation Pipe Co., Ltd. , http://www.chastainless.com